Bid Title: 38kV and 15kV Indoor Metal-Clad Switchgear for Northeast Distribution Substation Addition
Category: City Bids
Status: Open

Description:
Work generally consists of the following:
  • Furnishing and installation of the 38kV and 15kV Switchgear.
  • All materials, labor, and equipment for the delivery, unloading, installation, and commissioning testing of the 38kV and 15kV Indoor Switchgear.
See attached documents for more information.
Publication Date/Time:
7/9/2018 12:00 PM
Closing Date/Time:
7/31/2018 1:15 PM
Bid Opening Information:
07/31/2018 at 1:30 PM